ACT Polyols Assistant Manager Planning Jobs 2026 – Clifton, Karachi, Apply Before 30 November

ACT Polyols Private Limited

ACT Polyols Private Limited is hiring an Assistant Manager for its planning team in Clifton, Karachi. This full-time opening suits a professional who can turn customer demand into workable production plans and keep materials flowing on time. If you hold a degree in industrial engineering or supply chain management and have spent recent years planning production or materials, this role is worth a close look.

The job was posted on 27 October 2026 and applications stay open until 30 November 2026. Planning roles like this one are usually filled as soon as the right candidate is found, so applying early is the safer move.

ACT Polyols Assistant Manager Planning Jobs 2026 – Quick Facts

Detail Information
Company ACT Polyols Private Limited
Post Assistant Manager – Planning (1 opening)
Location Clifton, Karachi, Sindh
Job type Full-time
Education B.E. in Industrial Engineering OR BBA in Supply Chain Management
Experience 4 to 6 years in production, material or supply chain planning
Salary Not stated in the listing
Posted on 27 October 2026
Last date to apply 30 November 2026
How to apply Online through the official listing page (link below)

Last date to apply: 30 November 2026 — do not wait until the final day.

About ACT Polyols Private Limited

ACT Polyols Private Limited manufactures polyol products for industrial customers — key raw materials for foam, coatings, adhesives and insulation. Its planning team therefore sits at the heart of the business: a late shipment or stock-out can disturb a customer’s own production line.

The role is based in Clifton, Karachi. You will work with production, sales, supply chain, warehouse and export teams, so the job suits someone who enjoys coordination work as much as numbers and schedules.

What the Assistant Manager – Planning Will Do

The core of this job is simple to describe but demanding to do well: make sure the right products are made, in the right quantities, at the right time. In practice, the work covers:

  • Building production plans based on available capacity, customer demand and delivery commitments.
  • Managing material requirements planning (MRP), inventory levels, safety stock and material replenishment so production never stalls for want of a raw material.
  • Watching production schedules closely, spotting bottlenecks early and taking steps to minimise delays.
  • Coordinating with production, sales, supply chain, warehouse and export teams so that production and shipment schedules stay aligned.
  • Tracking planning key performance indicators (KPIs), studying performance gaps and driving continuous improvement in the planning process.

Eligibility Criteria for ACT Polyols Planning Job 2026

The listing sets two alternative education routes and a clear experience band:

  • Education: B.E. in Industrial Engineering, or BBA in Supply Chain Management, from a recognised university.
  • Experience: 4 to 6 years of hands-on work in production planning, material planning or supply chain planning.
  • Planning knowledge: Strong grip on inventory management, production scheduling and MRP logic.
  • Systems: Proficiency in ERP systems and MS Excel — you will live in these tools every day.
  • Working style: Analytical thinking, comfort with performance data, and the ability to coordinate across departments under delivery pressure.

No age limit, gender restriction or domicile condition is mentioned in the listing. The salary package is also not disclosed, so treat any salary figure quoted elsewhere online as unconfirmed.

Why This Role Is Worth Applying For

Planning roles build a rare combination of skills: manufacturing, inventory economics, supplier management and customer service all at once. That mix is in demand across chemicals, FMCG, textiles and pharmaceuticals, so experience gained here travels well. The 4 to 6 year band is a sweet spot — senior enough that your judgement shapes plans, but not only about managing other managers.

Important Dates – ACT Polyols Jobs 2026

Event Date
Advertisement posted 27 October 2026
Last date to apply 30 November 2026
Shortlisting / interviews Not announced — shortlisted candidates will be contacted

Documents to Keep Ready Before You Apply

  • Updated CV showing your planning experience and ERP tools used.
  • Degree and transcripts (B.E. Industrial Engineering or BBA Supply Chain Management).
  • Experience letters from previous employers covering the 4 to 6 year requirement.
  • CNIC and a recent photograph, if the application form asks for them.

How to Apply for ACT Polyols Assistant Manager Planning Job

  • Open the official listing page for this vacancy (link in the apply section below).
  • Read the full role description once more and confirm you meet the education and experience criteria.
  • Prepare your updated CV, tailored to planning work — highlight MRP, inventory control and ERP experience.
  • Submit your application through the listing page before 30 November 2026.
  • Keep a copy or screenshot of your submitted application for your own record.

Apply here: https://talenthubsol.com/jobs/assistant-manage-at-act-polyols-private-limited/

Frequently Asked Questions – ACT Polyols Jobs 2026

What is the last date to apply for the ACT Polyols Assistant Manager Planning job?

The last date is 30 November 2026, as shown on the official listing page. Apply well before that date to avoid last-minute problems.

What qualification do I need for this role?

You need either a B.E. in Industrial Engineering or a BBA in Supply Chain Management, plus 4 to 6 years of production, material or supply chain planning experience.

Where is this job located?

Clifton, Karachi — an on-site, full-time position, not a remote role.

Is the salary mentioned in the advertisement?

No. The listing does not disclose a salary figure. Any salary number you see on other websites is unconfirmed.

Do I need ERP experience to apply?

Yes. The listing asks for proficiency in ERP systems and MS Excel, plus strong knowledge of inventory management, production scheduling and MRP.

Can fresh graduates apply?

No. This role requires 4 to 6 years of relevant planning experience, so it is aimed at experienced professionals rather than fresh graduates.

Fraud warning: ACT Polyols Private Limited and its listing platform do not charge any fee for job applications. Never pay anyone who asks for money for a job offer or interview slot. Apply only through the official listing page linked above.

To apply for this job please visit talenthubsol.com.